Teams That Run Themselves

In one line People and machines form one system; groups that share a whole task and run it themselves can do better than narrow jobs.

After the Second World War, British coal mines brought in a new way of cutting coal along a long face. The work was split into narrow jobs spread over three shifts: one cut the coal, one loaded it, one moved the roof supports forward. Researchers from the Tavistock Institute in London, Eric Trist and Ken Bamforth, studied what followed, and in 1951 they reported in the journal Human Relations that the method had broken up the miners' small, close-knit groups. Each narrow group could blame the shift before it.

In later work the Tavistock team found pits using the same machines but organized differently. There, groups of miners shared the full cycle of work, swapped jobs among themselves, chose who did what on each shift and were paid as one group. These composite groups did better than narrowly divided ones working the same seam. The researchers called this responsible autonomy: the group, not a supervisor, ran its own work.

From this came the sociotechnical idea: a workplace is both a technical system of machines and methods and a social system of people, and the two must be designed together. Optimize the machines alone and the people suffer, and then so does the output. It travelled to Sweden. In 1974 Volvo opened a car plant at Kalmar where 25 teams each built part of the car at their own pace, without a moving line, and in 1989 a plant at Uddevalla, where small teams assembled entire cars.

Uddevalla closed in 1993 and Kalmar in 1994, as Volvo cut capacity. Critics took this as proof that team assembly could not match the line; one study of Uddevalla argued that its productivity was near the European average and rising, and that company politics decided its fate. Earlier in the course, The Moving Assembly Line showed what the moving line gained, and what it cost the people beside it.

Go deeper

Trist went on to work with Fred Emery, with whom the word sociotechnical is linked, and the approach spread into studies of work design in many countries. Its central claim is modest and still useful: the same technology can be run with very different ways of organizing people, so the way work is organized is a choice, not something the machine dictates. Some writers see in the mine studies an early form of ideas later found in lean and agile ways of working.

Two crews at the bus depot

Illustration: Two crews at the bus depot

Yassine supervises the night shift at a bus depot in Marrakesh, Morocco, where each bus must be cleaned, checked and refuelled before six in the morning. The jobs have long been split: cleaners clean, fitters check brakes and lights, a fueller fills the tanks, and each waits for the one before. When a bus comes back late, the chain stalls, and each group blames the next.

Yassine tries something new with four buses a night. He forms two small crews, each with a cleaner, a fitter and a fueller, gives each crew two buses, and lets them decide who does what and in which order. Within a week the fitters are refuelling while the cleaners finish, and the crews have begun swapping tips. The trial buses are ready forty minutes earlier on average. Then the cleaners ask to learn the simple checks, and Yassine has to ask the union and the safety office what they may do.

Try this today Pick one task your team hands from person to person, and ask what would change if one small group owned it from start to finish.

Question 1 of 2

A shoe workshop in León, Mexico, buys a faster stitching machine and splits the sewing of each shoe into six one-step jobs. Output rises for a month, then falls as faults climb and the sewers stop helping one another.

What would the sociotechnical idea say went wrong?

Question 2 of 2

Wanjala leads a crew that maintains signals on a railway line out of Nairobi, Kenya. He is told the crew will become self-managing: it will plan its own rota and share out its tasks.

Judging from the mine studies, which condition matters most for this change to work?