The People Not in the Room

In one line Those most affected often have the least power; go looking for them and bring their voices in on purpose.

Every planning meeting has an invisible guest list: the people the plan affects who are not in the room. On a hospital ward they are the night shift, asleep when the day staff meet, the cleaners and porters, and the patients themselves. In a family they are often the children and the very old. They have the most at stake and the least say, and a power grid puts them in a corner that is easy to read as unimportant.

Picture a ward moved to a new floor over a weekend. The day staff planned it carefully, but the night nurses find the drug cupboard is now at the far end from the sickest beds, and the porters learn on Monday that their trolleys do not fit the new lift. None of this was hard to know. It was simply known by people nobody asked.

In 1969 the American planning official Sherry Arnstein made a similar point in an article, 'A Ladder of Citizen Participation'. She ranked the ways officials involve people in eight rungs, from manipulation at the bottom to citizen control at the top, and called the middle rungs, informing, consultation and placation, tokenism when people's views could not change the outcome. Disability campaigners later put the same demand more briefly: nothing about us without us.

There are simple ways to bring absent voices in. Ask one person to speak for a group, and check back with them. Hold a meeting at a time or place the absent can manage, such as the start of the night shift. Or go where they are: walk the ward at three in the morning, or sit with the children. Earlier in the course, Go and See made the case for seeing work where it happens; the same habit finds the people a plan forgot.

Go deeper

Paulo Freire, a Brazilian educator, made the same point about teaching. In Pedagogy of the Oppressed (1968) he argued that programmes designed for people, without them, tend to fail or to serve their designers, and that those affected should help name the problem as well as receive the answer. His literacy circles in Brazil began by asking adults which words mattered in their own lives.

The move nobody asked her about

Illustration: The move nobody asked her about

Laila and her husband were moving their family from a flat in central Casablanca to a house on the edge of the city, nearer his new job. They planned it for weeks: the van, the dates, a new school for their son, which room would be whose. Two weeks before the move, Laila's mother, who lived with them, quietly asked how she would get to her sister's house and to the mosque she had gone to for thirty years.

Nobody had thought to ask her. She did not drive, and the new house was far from any bus she knew. Laila sat down with her that evening, and then with her son, who turned out to be dreading leaving his football club. They kept the move but changed the plan: a weekly taxi for her mother's visits, paid from the money set aside for new curtains, and a Saturday lift back to the old club until the season ended.

Try this today Pick one plan you are part of. Name one person it affects who was not at the meeting, and ask them one question about it this week.

Question 1 of 2

A town council in Jinja, Uganda, plans a new bus timetable at eight o'clock meetings with shop owners and drivers. The market traders, who start work at four in the morning, never attend.

Which step would best bring the traders' needs into the plan?

Question 2 of 2

Planners in Sfax, Tunisia, hold a public meeting about a new park, listen politely to residents for an hour, and then build the design they had chosen before the meeting.

How would Arnstein most likely describe this meeting?

Cite or share this lesson

A plain reference you can paste into notes or an essay:

Quest2Plan. “The People Not in the Room.” https://quest2plan.com/learn/lesson/the-people-not-in-the-room. Accessed 29 November 2026.

Sources
  • Sherry Arnstein — The planner whose 1969 'Ladder of Citizen Participation' ranked the ways people are involved in decisions.
  • Nothing About Us Without Us — The history of the slogan, from Central European politics to disability rights.
  • Participatory design — Designing with the people who will use the result, a practice that began with Scandinavian trade unions.