Who Does What

In one line Most projects need a sponsor, a lead, a team, users and experts, and each part owes the others something.

Projects often fail in quiet ways, when nobody is sure whose job something is. A decision waits because two people each think the other will make it, or a question goes unanswered because the person who knows was never asked. Naming the parts people play is a cheap way to stop this, and most projects, whatever their size, have the same handful.

The sponsor wants the result, provides the money and makes the big decisions. The lead runs the work from day to day: plans it, keeps it moving and raises problems early. The team does the work. The users are the people who will live with the result, and the experts are brought in for knowledge the team lacks. On a family house build these might be the relative paying, the builder in charge, the masons and carpenters, the family who will live there and the surveyor who checks the ground. On a small phone app for a clinic they might be the clinic's director, a lead programmer, two more programmers, the nurses who will use it and a doctor who checks the medical advice.

Each part owes the others something. The sponsor owes quick decisions and steady support; the lead owes honest news, good or bad; the team owes its best estimates and its work; the users owe their time to say what they need; the experts owe a straight answer in plain words. Earlier in the course, Who It's For showed how to find the people a project serves; this lesson names what each of them is there to do.

Two failures are common. A part with nobody in it, such as a project with no real user, builds the wrong thing. A part with two people in it, such as two leads, stalls the work while they disagree. A short table listing each part and the name beside it, agreed at the start, prevents both.

A wall at waist height

Illustration: A wall at waist height

Lucía is paying for a house for her parents on a hillside outside Cuenca, in Ecuador, while she works in Quito. Three weeks in, the kitchen walls stopped at waist height. The builder was waiting for her brother, who lived nearby, to approve a change to the window. Her brother thought the builder was waiting for Lucía. And her parents, who would live there, had not been asked where they wanted the window at all.

On her next visit Lucía wrote a short list on the back of a delivery note. She was the sponsor: she paid, and she would settle any big change within two days. The builder was the lead and ran the site. Her brother was not a second lead but her eyes nearby, passing news both ways. Her parents were the users, to be asked about anything they would live with. The surveyor was the expert for the slope. The wall was finished that week, with the window where her mother wanted it.

Try this today For one piece of work you are in, write who plays each part: sponsor, lead, team, users, experts. Circle any part with no name, or with two.

Question 1 of 2

A town in southern Rwanda is building a new public library. The mayor's office pays, an architect's practice runs the work, and the mayor will choose one of three designs next week. Students and teachers have not yet seen any of them.

Which part of this project has nobody playing it yet?

Question 2 of 2

A water company in Arequipa, Peru, writes the plan for fitting new meters: 'Sponsor: the board. Lead: the operations manager and the computing manager, jointly. Users: households. Expert: a meter engineer.'

Where is this plan weakest?