Quest2PlanChart the course. Lead the crew.

Lesson · 6 min Steady

Making Do Brilliantly

In one line Jugaad, ingenious making-do, can yield brilliant frugal designs, but improvising where safety is at stake is a gamble.

Jugaad is a Hindi word, also used in Urdu and Punjabi, for an improvised fix: a clever way round a problem with whatever is at hand. Its best-known image is a homemade vehicle of north India, put together by village mechanics from planks, sheet metal and, often, a diesel engine meant for an irrigation pump. Over time the word has come to mean a wider habit of doing more with less through ingenuity, and a popular business book, Jugaad Innovation, presented it to managers around the world as frugal innovation.

A celebrated example is the Jaipur foot. In 1968 a craftsman, Ram Chandra Sharma, and an orthopaedic surgeon, P. K. Sethi, developed in Jaipur an artificial foot of wood and rubber that was cheap to make and let its wearer squat, sit cross-legged and walk barefoot in a muddy field, things the costlier feet of the time did not allow. A charity registered in 1975 fits it free of charge, and it has been fitted in many countries, including to landmine survivors in Afghanistan. Its lesson: design for what users really do.

Yet in India the word is also a criticism. The jugaad vehicles had poor brakes and were banned on safety grounds, and Indian commentators have complained that jugaad excuses cutting corners: a quick patch on a leaking pipe, a test skipped to meet a date, a fix that nobody records. Where people's safety is at stake, improvising around a rule is not ingenuity but a gamble. Earlier in the course, Build It In, Don't Inspect It In argued that quality has to be designed into the work, not patched on afterwards.

The useful line runs between a frugal design that is thought through, tested and made to last, and a shortcut that works today and fails tomorrow. Telling them apart is a leader's job.

Go deeper

The Filipino paediatrician Fe del Mundo worked in this spirit. For villages without electricity she devised an incubator made from two bamboo baskets, one inside the other, warmed with hot-water bottles, so that small newborns could be kept warm where no hospital machine could run. A device made for its setting can do more good than a better one that cannot work there.

The trolley and the steriliser

Illustration: The trolley and the steriliser

Vivek is the only engineer at a mission hospital near Ranchi, India. The budget is thin, and he is proud of what he has made do with: bed frames welded from old scaffolding, a solar water heater built from a scrap tank, a trolley for meal trays on bicycle wheels. The nurses call him the jugaad king, and he enjoys it.

One morning the pressure gauge on the steam steriliser for surgical instruments fails. A nurse suggests fitting a gauge from an old boiler so the day's operations can go ahead. Vivek refuses. The steriliser kills germs only at the right pressure, and a gauge he cannot trust could let unsterile instruments through. He postpones two planned operations, borrows a tested gauge from the district hospital by afternoon, and records the fault in the maintenance log. That evening he explains to the staff why the trolley and the steriliser are different kinds of problem.

Try this today List one clever workaround your team relies on, and ask whether it has been tested and written down or just survives by luck.

Question 1 of 2

In a village workshop near Arusha, Tanzania, Upendo makes water filters from local clay and sawdust, fired in a village kiln, and sells them for a fraction of the price of imported ones. She sends a sample from each batch to a university laboratory for testing before selling.

Which side of jugaad does Upendo's work show?

Question 2 of 2

A site manager on a housing project in Lahore, Pakistan, praises a worker for propping sagging formwork with spare timber offcuts so the concrete pour can go ahead on time, without telling the engineer.

What is wrong with the manager's praise?

Cite or share this lesson

A plain reference you can paste into notes or an essay:

Quest2Plan. “Making Do Brilliantly.” https://quest2plan.com/learn/lesson/making-do-brilliantly. Accessed 30 November 2026.

Sources
  • Jugaad — The word and its languages, the jugaad vehicle and its safety ban, and frugal innovation.
  • Jaipur foot — Its development in 1968 by Ram Chandra Sharma and P. K. Sethi, its materials and what it lets wearers do.
  • Fe del Mundo — The Filipino paediatrician, her Children's Medical Center and her bamboo incubator for villages without electricity.