Lesson · 6 min Gentle
Ranges, Not Points
In one line Give an estimate as a range with a likely point; a single number hides how unsure everyone really is.
Ask a builder how long a job will take and you will usually hear one number: six weeks. It sounds helpful. But a single number hides the most important thing about any estimate, which is how sure the person giving it is. Six weeks might mean 'almost certainly between five and seven' or 'anywhere from four to twelve, and six if we are lucky'. Said as one figure, the two sound the same.
An honest estimate is a range with a confidence: four to seven weeks, most likely five, and I would be surprised to go past seven. The low end says how well it could go, the high end how badly it could reasonably go, and the likely point is the best single guess. The width is information too. A narrow range says the work is familiar; a wide one says there are unknowns, and tells the people paying where the risk lies. Studies of software estimates have found that ranges people called 90 per cent certain held the real effort only about 60 to 70 per cent of the time, so even honest ranges tend to be drawn too narrow.
Ranges also guard against a trap called Hofstadter's law, after the writer Douglas Hofstadter, who stated it half in jest in 1979: work takes longer than you expect, even when you allow for that. A planner who knows jobs run late adds a margin chosen by feel and stops worrying. Because the surprises that cause delay are the ones nobody listed, a margin chosen by feel is usually too small. Earlier in the course, The Planning Fallacy showed the cure: set the high end from how long similar work really took.
Someone will always ask, 'Yes, but which day?' Give the likely point, keep the range beside it in writing, and treat the gap as one visible margin the whole team watches shrink as the work goes on.
Two quotes for a loft

Nasser and his wife want to turn the loft of their terraced house in Sheffield, England, into a bedroom for their teenage sons before the new school year. Two small builders come to look. The first glances at the roof and says six weeks: start in May, done by mid-June. The second spends an hour in the loft with a torch and writes down five to nine weeks, most likely seven.
Nasser's first instinct is to take the shorter, firmer answer. Then he asks the second builder where the spread comes from. The steel beams, she explains, take one to three weeks to arrive, and nobody knows the state of the old roof timbers until the boards come up. If they are sound, five weeks; if two need replacing and the beams are late, nine. Nasser realizes the first builder faces the same beams and the same timbers but has not mentioned them. He hires the second builder, plans for nine weeks, and tells the boys they will share a room until the end of July.
Try this today Think of a date you have promised someone. Write down the earliest and the latest it could honestly be, and notice how wide the gap is.
Cite or share this lesson
A plain reference you can paste into notes or an essay:
Quest2Plan. “Ranges, Not Points.” https://quest2plan.com/learn/lesson/ranges-not-points. Accessed 29 November 2026.
Sources
- Cone of Uncertainty — How uncertainty in an estimate is greatest at the start of a project and narrows as work goes on.
- Hofstadter's law — The joke law from Gödel, Escher, Bach that work takes longer than expected, even allowing for it.
- Software development effort estimation — Research on estimates, including how often stated ranges actually contain the real effort.