A Successful Failure

In one line When Apollo 13's mission failed, its teams split the crisis into problems and brought the crew home.

Apollo 13 left Florida on 11 April 1970 to land two men on the Moon. About 56 hours into the flight, one of the two oxygen tanks in the service module exploded, and the other began to leak. The tanks fed the fuel cells that made the command module's electricity and water. Within hours the three astronauts, Jim Lovell, Jack Swigert and Fred Haise, were short of power, water and breathable air.

The landing was abandoned, and the goal became getting home. The crew moved into the lunar module, Aquarius, which was designed to keep two men alive for about two days and now had to keep three alive for four. Power was cut to the lowest level that would run the essentials; the cabin fell to a few degrees above freezing, and water was rationed. Carbon dioxide built up, because the command module's spare filter canisters were square and the lunar module's sockets were round. Engineers in Houston worked out an adapter from what was on board, including plastic covers from manuals and tape, and read the instructions up to the crew, who built it.

Mission control worked the crisis as several problems at once: the path home, the power budget, the air, and the procedures for waking the cold command module before re-entry, written in about three days instead of the usual three months. The crew splashed down in the Pacific near Samoa on 17 April.

NASA has called the mission a successful failure: it failed its purpose and succeeded at what mattered most. The review that followed traced the explosion to damage done on the ground, when the tank's heaters were run during a test at a higher voltage than their switches were built for. As in the cheese model of Holes in the Cheese, the holes had lined up long before the flight. Earlier in the course, How Apollo Was Run described the organization behind the programme.

The ferry with no cooling

Illustration: The ferry with no cooling

Fajar is chief engineer of a passenger ferry crossing between Lombok and Sumbawa, in Indonesia. In the middle of a crossing, with two hundred passengers aboard, the pump that cools the main engine failed. There was no spare. The captain dropped the timetable at once: the only goal now was to reach harbour safely.

Fajar split the crew into small teams. One kept the passengers calm and shared out drinking water, since the voyage would run long. One radioed the port and arranged a tug to stand by. Fajar and two mechanics stripped the deck-washing pump, joined it to the cooling line with spare hose and clamps, and ran the engine at half power, checking its temperature every ten minutes. The ferry arrived five hours late with nobody hurt. At the debrief the captain called it the best failure of the year, and the company put a spare cooling pump on every ship.

Try this today Think of a goal at work that might fail. Name what would matter most if it did, and what you would protect first.

Question 1 of 2

During a power cut at a vaccine store in Kisumu, Kenya, the team splits up: one person logs fridge temperatures, one finds a generator, and one phones the clinics waiting for doses.

What did this team share with Apollo 13's mission control?

Question 2 of 2

Gulsara leads a hiking club's trek in the Pamir mountains of Tajikistan. A storm forces the group to turn back a day short of the pass, and she brings every member down safely.

Why might the trek fairly be called a successful failure?

Cite or share this lesson

A plain reference you can paste into notes or an essay:

Quest2Plan. “A Successful Failure.” https://quest2plan.com/learn/lesson/a-successful-failure. Accessed 29 November 2026.

Sources
  • Apollo 13 — The mission, the oxygen tank explosion, the lunar module lifeboat and the improvised carbon dioxide adapter.
  • Apollo 13: The Successful Failure — NASA's own account of the mission and the lessons it took from it.