Lesson · 6 min Stretch
The Stages of a Team, and Their Limits
In one line Tuckman's stages give useful words for how groups develop, but teams do not pass through them in a fixed order.
A new group often feels polite and careful at first, then prickly, then settles into a way of working. In 1965 Bruce Tuckman, an American psychologist, gave that pattern names that have stuck. He reviewed about fifty published studies of small groups, most of them therapy groups and training groups, and proposed four stages: forming, storming, norming and performing.
In forming, members test what is expected and lean on the leader. In storming, they push back against the task and each other, often over roles and control. In norming, they accept one another and agree how to work, and in performing their energy goes into the task itself. In 1977, after reading twenty-two further studies with Mary Ann Jensen, Tuckman added a fifth stage, adjourning, for the time when a group finishes and breaks up.
The model spread because it is easy to remember and because it reassures: a row in week three need not mean the team is failing. Yet Tuckman offered it as a hypothesis, drawn from groups quite unlike most project teams, a point made earlier in What Counts as Evidence. Even in his own sources only about half showed a distinct stage of conflict. Teams also go back: a new member, a changed goal or a crisis can bring old arguments round again, and some teams never argue openly at all.
So the stages work best as words for talking about a team, not as a timetable for managing one. A lead who waits for storming to pass, or stirs up a quarrel because one is due, is managing the model instead of the people. The better question is what the team is struggling with now, and whether the struggle is about the work.
The quarrel about the judges

Rahmat teaches physics at a secondary school in Samarkand, Uzbekistan, and chairs the five teachers planning the city's first science fair for schools. The first two meetings were cheerful, and nobody disagreed about anything. At the third, a quarrel broke out over whether teachers or visiting engineers should judge the projects, and two colleagues left early.
Rahmat had read about Tuckman's stages and was tempted to tell everyone this was storming and would pass. Instead he asked what the quarrel was about. It was a real question nobody had settled, and behind it lay a worry that teachers would favour their own pupils. The group agreed on mixed panels, with no teacher judging their own school, and wrote the rule down. A month later a new member joined, and the arguments came back for a week. The stages had not arrived in a neat line.
Try this today Think of a team you belong to. Name the one thing it is struggling with this week, without using the name of any stage.
Cite or share this lesson
A plain reference you can paste into notes or an essay:
Quest2Plan. “The Stages of a Team, and Their Limits.” https://quest2plan.com/learn/lesson/forming-storming-and-their-limits. Accessed 29 November 2026.