Lesson · 6 min Stretch
Interests, Not Positions
In one line Behind each position lies an interest, and looking for interests opens options that a clash of positions closes.
In 1981 Roger Fisher and William Ury, of the Harvard Negotiation Project, published Getting to Yes, a short book on reaching agreement without either giving in or digging in. Its best-known advice is to focus on interests, not positions. A position is what someone says they want: 'I need the site on Monday.' An interest is why they want it: the crane arrives on Tuesday and must stand on firm ground before the rains.
Positions clash because each side has picked one answer in advance. Interests often do not, because one need can be met in several ways. The book retells a story that Mary Parker Follett told in 1925. In a small room of the Harvard library, someone wanted the window open and she wanted it shut. They opened a window in the next room, where nobody sat: he got fresh air, and she escaped the north wind blowing straight onto her. A half-open window would have suited neither.
Finding interests takes questions rather than arguments. Why does that matter to you? What would happen if you did not get it? What are you worried about? Fisher and Ury's other advice follows: invent several options before choosing one, and judge them by fair standards both sides accept, such as a market price or an engineer's test, rather than by who pushes harder. This is the method behind the collaborating way in Five Ways to Handle a Conflict.
It has limits. Critics note that some conflicts are about values, or about one fixed sum of money, where no clever option makes both sides whole, and that a much stronger side may not bother looking for interests. Fisher and Ury's answer was to know your best alternative to a negotiated agreement, what you will do if talks fail, so that you can tell when a deal is worse than walking away.
Go deeper
U Thant, the Burmese diplomat who was UN Secretary-General during the Cuban missile crisis of 1962, worked in this way. His messages to the American and Soviet leaders asked each side for a pause, a step that served both sides' interest in avoiding war without asking either to give up its stated position at once.
The crane and the drain

Bahati is the site agent for a contractor building a health centre in Mwanza, Tanzania. The groundworks firm said it would not leave the site before Friday; the crane company said its crane must be set up on Monday. Bahati stopped asking who was right and asked each foreman what Monday or Friday gave him. The groundworks foreman needed to finish drainage he would not be paid for until it passed inspection. The crane operator needed compacted, level ground for the outriggers. The north side was already finished, so the crane stood there on Monday while drainage carried on along the south.
Daoud, an engineer for the city council of Sfax, on the Tunisian coast, faced residents who insisted that a new storm drain must not go down their street. At a meeting he asked what worried them. The answer was the next street over, where the road had been dug up for six months and two shops had closed. The council could not move the drain, but it could dig in short sections at night and keep every shopfront open. The residents' position had hidden an interest the council could meet.
Try this today In your next disagreement, ask the other person: 'What would that give you?' Write down the need behind the answer.
Cite or share this lesson
A plain reference you can paste into notes or an essay:
Quest2Plan. “Interests, Not Positions.” https://quest2plan.com/learn/lesson/interests-not-positions. Accessed 30 November 2026.
Sources
- Getting to Yes — Fisher and Ury's 1981 book from the Harvard Negotiation Project and its four principles.
- Best alternative to a negotiated agreement — What a BATNA is and where the idea came from.
- To Mary Parker Follett: an apology from a fan — A mediator on Follett's library window story and how Getting to Yes used it.