Accidents That Are Normal

In one line In some systems, small failures combine faster than anyone can understand them, so accidents are built in.

Early on 28 March 1979 a relief valve stuck open in the second reactor at Three Mile Island, a nuclear power station in Pennsylvania, and cooling water drained away through it. A light in the control room showed only that the valve had been sent the signal to close, so the operators believed it was shut. Reading other gauges as a sign of too much water, they cut back the emergency cooling. By the time the fault was found, hours later, about half the reactor core had melted. The steel vessel around it held, and most of the radioactivity stayed inside.

The sociologist Charles Perrow argued in Normal Accidents (1984) that this was not mainly a story of poor operators. Two features of a system, he said, make accidents certain sooner or later. The first is interactive complexity: parts affect one another in ways the designers did not foresee and the operators cannot see, so two small failures can combine into something no procedure covers. The second is tight coupling: one step follows another quickly, with little slack, so there is no time to understand a fault before it spreads. Where both are present, accidents are normal in the sense of built in, however careful the people.

His conclusion was uncomfortable. Extra alarms and safety devices add parts that can interact in new ways. For systems that are complex, tightly coupled and capable of catastrophe, he suggested radical redesign, or giving the technology up.

Others disagreed. Researchers who studied aircraft carriers and air traffic control found organizations running dangerous, complex work with very few accidents, and argued that training, culture and constant attention can prevent much of what Perrow called inevitable. Some call Perrow's view fatalistic; his defenders reply that faith in good management can itself be dangerous. For a project lead the practical questions are how complex and how coupled the work is, and where slack could be added.

Six hours in the tank

Illustration: Six hours in the tank

Fayza is the process engineer at a water treatment plant in Alexandria, Egypt. One night a storm caused a brief dip in power. The chlorine dosing pump restarted at once, but the sensor that measured chlorine in the water shared its power supply and froze on its last reading. The control system saw a normal reading and kept dosing. Nobody had imagined the two parts failing together; on paper they were separate.

What saved the city was slack. Treated water sat in a holding tank for about six hours before it was pumped to homes, and a technician's routine hand test at dawn found the level far too high. The tank was held back and diluted. In the review Fayza did not add another alarm. She gave the sensor its own power supply, so the two failures could not combine again, and she argued successfully against a plan to shrink the holding tank to save space.

Try this today Pick one process you run. Ask how quickly a fault in one step reaches the next, and where there is any slack to stop it.

Question 1 of 2

At a chemical works near Izmit, Turkey, a fault in one reactor reaches the next stage within seconds, and there is no tank between the two to hold material while operators think.

Which of Perrow's terms fits this feature best?

Question 2 of 2

Gunawan compares three operations in Surabaya, Indonesia: a hospital intensive care unit, a ferry's engine room and the city library's lending service.

Which, in Perrow's terms, is least prone to a normal accident?

Cite or share this lesson

A plain reference you can paste into notes or an essay:

Quest2Plan. “Accidents That Are Normal.” https://quest2plan.com/learn/lesson/accidents-that-are-normal. Accessed 29 November 2026.

Sources
  • Normal Accidents — Charles Perrow's 1984 book on why complex, tightly coupled systems fail, inspired by Three Mile Island.
  • Charles Perrow — A short life of the Yale sociologist and his later work on reducing vulnerability to disaster.
  • Three Mile Island accident — The 1979 accident in Pennsylvania: the stuck valve, the misread light and the partial meltdown.