Lesson · 6 min Steady
The Rugby Approach
In one line Fast product teams work like a rugby side, not a relay: one mixed team carries the work together from start to finish.
In January 1986 two Japanese business professors, Hirotaka Takeuchi and Ikujiro Nonaka, published an article in the Harvard Business Review called 'The New New Product Development Game'. They had studied how firms such as Fuji-Xerox, Canon, Honda and NEC brought out new products quickly: copiers, cameras, a small car, a personal computer. Slow firms worked like a relay race, with marketing passing the baton to design, design to engineering and engineering to the factory. Fast ones worked like a rugby team, which in the authors' words 'tries to go the distance as a unit, passing the ball back and forth'.
In practice that meant a hand-picked team from several departments that stayed together from first idea to production. Management set a broad, very demanding goal and then kept out of the daily work. Fuji-Xerox gave its FX-3500 copier team two years to match its high-end machines at half the cost, and put planners, designers, production and sales people in one large room. Phases overlapped; Fuji-Xerox called this its sashimi system, after slices of raw fish laid overlapping on a plate. Development took 29 months, against 38 for an earlier model.
The authors named six features: built-in instability, self-organizing teams, overlapping phases, 'multilearning' across skills and levels, subtle control, and passing learning on to later projects. Within a decade Ken Schwaber and Jeff Sutherland had borrowed the word scrum for a software method, so the article is often read as where agile began.
That origin matters. These were physical products, where a change costs real money, so the rugby idea rests on a mixed team learning together, not on cheap change. The authors also named its limits: it demanded extraordinary effort, sometimes 100 hours of monthly overtime at the peak, and might not suit breakthrough research or giant aerospace projects too big for constant face-to-face work.
One room for the pump

Jalal runs product development at a firm in Kenitra, Morocco, that makes irrigation pumps. The last new model went the usual way. Designers spent eight months on drawings and passed them to the foundry, which sent them back: two parts could not be cast as drawn. Then sales reported that farmers wanted a pump they could repair with ordinary tools. The model reached the market a year late.
For the next pump Jalal picked seven people from design, casting, assembly and sales, plus an engineer from the firm that supplies the motors. He gave them one room and one goal: a pump farmers can mend themselves, at two-thirds of the old cost, within eighteen months. The foundry engineer began sketching moulds while the design was still rough, and the sales member carried farmers' broken pumps into the room. Jalal stopped asking for reports on each phase and asked instead what the team had learned that week.
Try this today Think of a piece of work that passes through several hands. Mark each handover, and ask what gets lost at each one.
Cite or share this lesson
A plain reference you can paste into notes or an essay:
Quest2Plan. “The Rugby Approach.” https://quest2plan.com/learn/lesson/the-rugby-approach. Accessed 29 November 2026.
Sources
- The New New Product Development Game — Takeuchi and Nonaka's article in the Harvard Business Review, with the relay race and the rugby team.
- Hirotaka Takeuchi — The co-author's life and work, and how the article fed into Scrum.
- Ikujiro Nonaka — The other co-author, known for his work on how organizations create knowledge.