Lesson · 6 min Stretch

Changing a Culture Slowly

In one line A failing car plant changed its culture by changing daily work first; belief followed, slowly, and was hard to copy.

In 1982 General Motors closed its car plant at Fremont, California. It had a reputation as one of the worst in the company, with frequent strikes and grievances, and on an ordinary day about one worker in five did not turn up. In 1984 GM and Toyota reopened it as a joint venture, New United Motor Manufacturing, Inc., known as NUMMI. More than 85 per cent of the first workforce came from the closed plant, along with their union leaders.

Groups of workers were flown to Toyota's Takaoka plant in Japan to learn its system. Back in Fremont they worked in small teams to standard methods that they were expected to improve, and could pull a cord to call for help, and stop the line if need be, when they found a problem. According to John Shook, an American who helped design their training, the plant went from the worst quality in GM's system to the best within about a year, and absenteeism fell to around 2 per cent.

Shook's reading was that the workers did not change their beliefs first and their work second. The daily work changed; people found they could do it well, and that raising a problem brought help rather than blame; and new beliefs grew from that experience. In the language of What Leaders Pay Attention To, what managers responded to had changed.

GM found this hard to copy. Its managers could see the new practices, but spreading them meant changing how other plants were run from the top, and by 1998 the approach had still not spread across GM's American plants, though managers trained at NUMMI introduced it in plants in Brazil. A culture can be changed by changing practice, but slowly, and not by copying the visible parts alone.

Go deeper

One of GM's attempts to spread the approach was at its plant in Van Nuys, California. Workers and managers there resisted the changes, suppliers did not cooperate, and GM closed the plant in 1992, leaving about 2,600 people without jobs. Its plant manager later concluded that a single plant cannot make such a change on its own when the company around it carries on as before.

The board on the workshop wall

Illustration: The board on the workshop wall

Mufaro is the new manager of a railway maintenance workshop in Bulawayo, Zimbabwe, where locomotives often leave late. The fitters blame the stores, the stores blame the drawings, and everyone blames head office. His predecessor ran three workshops on teamwork, and nothing changed.

Mufaro changes the day instead of the speeches. Each shift starts with ten minutes at a board on the wall that shows every locomotive, its next job and anything blocking it. When a fitter flags a missing part, a supervisor goes to the stores at once and reports back before the shift ends. For weeks the fitters test whether this is real. By the fourth month they are flagging problems before anyone asks, and one of the older fitters tells a newcomer, 'Here, if you say it, somebody comes.'

Try this today Choose one belief you want your team to hold, and name one daily practice that would give people evidence for it.

Question 1 of 2

A bus company in Izmir, Turkey, wants drivers to report faults on their vehicles. Management launches a poster campaign about openness, but nothing about how reported faults are handled changes.

What would the NUMMI story suggest instead?

Question 2 of 2

A trainer at a transport ministry in Hanoi uses the NUMMI case in a course for bus depot managers.

What point does the case make best?