A Review Without Blame

In one line After a failure, ask why each action made sense at the time, so people tell the truth and the system gets fixed.

When something goes wrong, the first question people reach for is who did it. Once a name is found the inquiry tends to stop: the person is warned or retrained, and everyone else learns to keep quiet next time. Earlier in the course, What a Failed Project Teaches argued that this hides the conditions that made the mistake possible. A blameless review is the practical method for doing otherwise.

The safety researcher Sidney Dekker, in The Field Guide to Human Error Investigations (2002), argued that what looks like a foolish error afterwards usually made sense to the person at the time. They acted on what they could see, the goals they were balancing and what they had been taught. The reviewer's task is to find out why the action seemed reasonable then, because the same pressures will lead the next sensible person to the same place.

The review has a rhythm. First make things safe, and tell those involved plainly that the review is for learning, not punishment. Then build a timeline from records as well as memory: what each person saw, knew and did, in order. At each key decision, ask what made it seem right. Look for the conditions behind it, such as fatigue, a confusing screen or a handover with no checklist, and expect more than one. Agree changes to tools, checks, staffing or procedures; 'be more careful' is not a change. Then write a short account, share it widely, and thank the people who spoke openly.

Reviews fail in familiar ways. A report says 'no blame' and then names one person's error as the cause, or managers quietly punish people afterwards and the next review hears nothing true. As Lessons That Change Something put it, a review counts only if something changes. And blameless does not mean that anything goes, which is the next lesson's question.

The two screens

Illustration: The two screens

Elikem runs operations for a mobile payments service in Accra, Ghana. At two in the morning an engineer ran a clean-up command meant for the test system against the live one, and payments stopped for three hours across the country. By breakfast a director wanted to know who had done it. Elikem opened the review by saying that nobody would be disciplined for an honest action, and that the aim was to stop it happening to anyone else.

The timeline came from chat logs and system records. The engineer explained that the two systems had names differing by one letter, the two terminal windows looked identical, and the written procedure said only 'run on the server'. She had been on call for fourteen hours. Each step had made sense to her. The changes were concrete: live terminals now show a red banner, commands on the live system need a second person, and the systems were renamed. The account went to every engineering team, with thanks to the engineer for her candour.

Try this today Think of a recent mistake at work. Write down what the person could see and was juggling when they made it.

In the Toolkit, step by step: Blameless post-incident review →

A real project where it mattered: Apollo 13 →

Question 1 of 2

At a hospital in Rabat, Morocco, a nurse almost gives a patient a drug he is allergic to, and a pharmacist catches it. The review lead opens by asking the nurse, 'Why did you not check the allergy band?'

What would a blameless review ask instead?

Question 2 of 2

A review after a load swung loose from a crane on a building site in Doha, Qatar, ends with one action: 'All operators to take more care when loading.'

What is wrong with this action?

Cite or share this lesson

A plain reference you can paste into notes or an essay:

Quest2Plan. “A Review Without Blame.” https://quest2plan.com/learn/lesson/a-review-without-blame. Accessed 29 November 2026.