Small Experiments

In one line Where cause and effect show only afterwards, run several cheap trials at once, then grow what works and stop what does not.

When a problem is complex, a long study before acting gives false confidence: the study describes how things were, and the situation shifts as soon as you touch it. Dave Snowden's answer, set out with Mary Boone in A Leader's Framework for Decision Making (2007), is to probe first, then sense what happens, then respond. The probes are experiments that are safe to fail.

A safe-to-fail probe has a few marks. Several run at the same time, and they differ, sometimes even pull in opposite directions, so the team learns which way the situation leans rather than testing one favourite idea. Each is small and cheap, so its failure harms no one much. Each has, written in advance, what success and failure would look like. And there is a plan for what to do next: amplify a probe that shows promise by giving it more room, and dampen one that goes badly by stopping it. Snowden expects some probes to fail, since failure teaches as much as success.

This is the opposite of fail-safe design, which suits complicated systems such as a bridge or a power line, where engineers work hard to make failure impossible. In a complex situation that effort is wasted, because nobody can foresee the failure to prevent. Earlier in the course, Complicated Is Not Complex showed why the two need different handling.

Probes go wrong in familiar ways. A single pilot with a director's name on it cannot be allowed to fail, so it is not a probe. Too few probes teach little. Nobody watches the results, or a promising probe is scaled up across a whole country before it has been tested in a second place. The hardest part is often stopping a trial that someone likes.

Four trials before the rains

Illustration: Four trials before the rains

Bunthoeun is head teacher of a primary school outside Siem Reap, Cambodia. Every rainy season attendance drops, and nobody agrees why: flooded paths, children needed at home, hunger, or simple habit. The district office wanted a plan. Instead he chose four small trials for six weeks, each in a different village: a shared bicycle for each group of five pupils, a morning rice porridge for one class, a weekly text to parents, and older pupils walking the younger ones to school.

Before starting, he wrote on the staff-room wall what each needed to show: at least four more children a day in that village, kept up for a month. The texts reached few parents and he stopped them in the third week. The porridge helped a little and cost a lot. The walking groups lifted attendance in their village by more than he had hoped, and the older pupils were proud to lead them. He extended the walking groups to three more villages the next term, and kept the bicycles running to see whether their small gain would last.

Try this today For one stubborn problem, write three different small trials you could run next week, and what result would make you stop each.

Question 1 of 2

A charity in Guatemala City wants street vendors to join its savings scheme. Few have signed up, and staff disagree about whether the barrier is trust, time or the paperwork.

Which plan follows the idea of safe-to-fail probes?

Question 2 of 2

A charity in Kisumu, Kenya, announces a 'trial' of mobile health clinics. It has a large budget, the director's name in the press release and a launch with the governor.

Why is this not a safe-to-fail probe?