Lesson · 6 min Steady
Fayol's Principles
In one line Fayol's principles include one boss per person and a bridge for direct talk; projects test both.
When Henri Fayol published his book on administration in 1916, he set out fourteen principles drawn from a lifetime running a French mining and metals company. Among them were division of work, authority, discipline, fair pay, order, equity, stability of staff and initiative. Earlier in the course, Fayol's Five Jobs of a Manager met his account of what a manager does; the principles describe how an organization should be built around that work.
Unity of command was one of his firmest: each person should take orders from one superior only. Two bosses giving different orders, he argued, breed confusion, conflict and blame. He criticized Taylor on this point, since Taylor's plan for functional foremen gave a worker several bosses, each for one part of the job, which Fayol called a negation of unity of command. A related principle, unity of direction, asked for one head and one plan for each group of activities with the same aim.
Another principle was the scalar chain, the line of authority from the top to the bottom, through which orders and reports should pass. But in a large firm, a question from one department to another might climb many steps and then come down. Fayol's answer was a bridge, called the gangplank: two people at the same level in different branches deal with each other directly, as long as their superiors agree and are kept informed. A pit engineer and the head of the surface workshop could settle a pump repair between them rather than through the director.
Project teams often break the first rule on purpose. In a matrix, developed in aerospace in the 1950s, people answer both to their department and to a project lead. Fayol's warning still bites: conflicting orders and divided loyalty. The matrix answers that projects need skills held in many departments. Which side matters more depends on the work, and on how clearly each boss's say is drawn.
Two weeks for a pump part

Ghassan is a maintenance engineer at a phosphate mine in southern Jordan. When a slurry pump fails, the spare impeller he needs sits in the processing plant's store, a kilometre away. The rule is that his request goes up to the mine manager, across to the general manager, and down to the plant's maintenance chief. Last time it took two weeks, and the pump stood idle.
Ghassan and the plant's maintenance chief meet their two managers together and propose a bridge. For parts below a set value they will deal directly, and each will copy his manager on a short weekly note of what was lent and why. The managers agree, on condition that anything larger still goes up the chain. The next impeller crosses the site the same afternoon, and both managers still know exactly where it went.
Try this today Write down whose instructions you follow at work. If there is more than one name, note what each one decides.
Cite or share this lesson
A plain reference you can paste into notes or an essay:
Quest2Plan. “Fayol's Principles.” https://quest2plan.com/learn/lesson/fayols-principles. Accessed 29 November 2026.
Sources
- Henri Fayol — His career and his fourteen principles, including the scalar chain and the gangplank.
- Fayolism — Fayol's theory, including unity of command and his criticism of Taylor's functional foremen.
- Matrix management — Organizations where people answer to a department and a project, with its gains and costs.