
Lesson · 6 min Steady
Small Improvements Every Day
In one line Kaizen is improvement by everyone, through many small changes made by the people who do the work.
Kaizen is a Japanese word for improvement, change for the better. In lean it has come to mean continuous improvement by everyone: not a rare project led by experts, but many small changes made week after week by the people doing the work. A drawer sorted so the right tool is in reach, a form with one box removed, a shelf moved nearer the bench. Each is trivial; a thousand of them are not.
The habit has roots on both sides of the Pacific. During the Second World War the United States ran a programme called Training Within Industry, whose job methods course taught people to break a job into steps, question each one and propose a better way; after the war it was taken up widely in Japan. In 1951 Toyota set up a suggestion system modelled on one at Ford. By 1974 its staff had made over a million suggestions, and by 1988 over twenty million. Masaaki Imai's book Kaizen: The Key to Japan's Competitive Success (1986) spread the word among managers elsewhere.
A team usually works it as a simple loop. Gather ideas from those doing the work. Pick one small enough to try within days. Try it, check whether it helped, and keep it, change it or drop it.
Small changes owned by the doers tend to stick. They are cheap to try and to undo, so people dare to try them; they fit the work, because they come from people who know it; and people look after what they made. The risk is that a team polishes small things while a large problem waits. Kaizen sits alongside bigger changes rather than replacing them. Earlier in the course, Seeing Waste trained the eye; kaizen is the hand that acts.
Go deeper
In many organizations outside Japan, kaizen came to mean something narrower: the kaizen event, sometimes called a blitz, in which a team sets aside its usual work for a week to redesign one process. Events can make large changes quickly, and some organizations use them well. But they differ from daily kaizen in one important way. Improvement becomes something done to the work now and then, often with outside help, rather than part of the work itself. Many lean teachers argue that an event is worth most when it leaves behind a team in the habit of small changes every week.
Thursdays by the kettle

Zaid leads a team of six answering customer complaints at the water company in Irbid, Jordan. Every Thursday they spend fifteen minutes at a whiteboard by the kettle. Anyone can write up something that annoyed them that week, and the team chooses one item to try before the next Thursday.
Over a season the changes are tiny: a standard reply for the five commonest complaints, a shared folder sorted by street instead of by date, a phone number moved to the top of the letter so that fewer people ring to ask for it. One idea, a second check on every reply, is tried and dropped because it slowed everything down. None of the changes needed money or a manager's approval. By the end of the season the team answers complaints in half the time, and the board has become the part of the week people miss when it is cancelled.
Try this today Choose one small annoyance in a task you do every day. Change one thing about it this week, and check after a week whether it helped.
Cite or share this lesson
A plain reference you can paste into notes or an essay:
Quest2Plan. “Small Improvements Every Day.” https://quest2plan.com/learn/lesson/small-improvements-every-day. Accessed 29 November 2026.
Sources
- Kaizen — The word's meaning, its roots in Training Within Industry, kaizen events and Masaaki Imai's 1986 book.
- Training Within Industry — The wartime American programme whose job methods course became a basis of kaizen in Japan.
- Creative Idea Suggestion System (Toyota, 75 Years history) — Toyota's suggestion system from 1951, based on Ford's, and the growth in suggestions to over twenty million by 1988.