Twelve Million Mothers

In one line When a programme grows beyond what you can watch, what you pay for and check is what you get.

In the late 1970s diarrhoea was among the biggest killers of young children in Bangladesh. Researchers in Dhaka had shown that a drink of water, salt and sugar could replace what the body loses, but most villages were far from any clinic. BRAC, the organization Fazle Hasan Abed had founded in 1972 after the war of independence, set out to teach mothers to make the drink at home: a pinch of salt and a fistful of gur, the local raw cane sugar, in half a litre of water.

It began small. After a trial in two villages of Sulla in 1979, the Oral Therapy Extension Programme started in 1980. Women workers went from house to house, teaching each mother seven points, from the signs of diarrhoea to mixing and giving the drink, feeding and prevention. Then separate monitors visited about one in ten of the mothers a worker had taught, asked what she remembered and had her make the drink. The worker's pay depended on how those mothers scored, not on how many doors she had knocked on.

The checks found problems, and the programme changed. Fathers often decided on a child's treatment, so men were taught too, at village markets, and the drink was taught in schools. From 1980 to 1990, district by district, BRAC's workers reached about twelve million households across rural Bangladesh, and years later many still knew how to make the drink.

The lesson for anyone growing a trial into a programme lies in what was measured. Counting visits would have rewarded speed; testing what mothers remembered rewarded teaching. A programme spread across a country cannot be watched everywhere, so what it pays for and checks shapes what it gets. The cost is that such checks take people, money and trust, and they set the pace of growth.

The water jars of Kashkadarya

Illustration: The water jars of Kashkadarya

Mahliyo runs a regional health programme in Kashkadarya, Uzbekistan, teaching families in farming villages to store drinking water safely, in covered jars, poured rather than dipped. The first year's reports looked excellent: community educators had made thousands of visits and handed out thousands of leaflets. Yet the clinics saw no fall in stomach illness.

Mahliyo changed what the programme counted. A small team began visiting a random sample of the households each educator had taught, a few weeks later, to look at the jars and ask how water was drawn. Educators earned a bonus based on what the team found, not on visits made. In the first round, fewer than half the households had changed anything. The educators began returning to show families how, and within a year the sampled homes were mostly storing water safely.

Try this today Look at one number your team reports. Ask whether it counts effort or results, and what you would check if you could check one thing.

Question 1 of 2

A literacy charity in Lusaka, Zambia, pays volunteer tutors a small fee and wants to grow from one district to ten.

Which way of paying tutors best follows BRAC's example?

Question 2 of 2

A health agency in Tete, Mozambique, wants to teach families to use bed nets against malaria in every district at once, starting next month.

What would BRAC's path suggest doing first?