The Courage to Turn Back
In one line Sometimes stopping short of the goal is the success; set your turn-back point before the pull to keep going begins.
On 9 January 1909 Ernest Shackleton and three companions, Frank Wild, Eric Marshall and Jameson Adams, stood at 88 degrees 23 minutes south, about 180 kilometres from the South Pole. Nobody had been closer. They had marched since late October, lost their last pony in a crevasse, and found and climbed the Beardmore Glacier. Shackleton turned them round. 'We have shot our bolt,' he wrote.
Already at Christmas, still outward bound, they had barely a month's food left, so the journey back became a race against starvation on half rations. They reached the coast in the last days of February, only just before the ship was due to leave. Going on to the Pole would almost certainly have killed them all. Shackleton's wife later recalled his remark that a live donkey is better than a dead lion.
Turning back is hard because of what climbers call summit fever: near the goal, tiredness and longing narrow judgement, and every step already taken seems to argue for one more. Projects feel the same pull as sunk cost: so much money and effort has gone in that stopping feels like waste, though what has been spent is gone whichever way the decision goes. Earlier in the course, Letting a Project End looked at that trap, and on Everest, as The Rope Team told, Bourdillon and Evans turned back from the South Summit and the climb still succeeded.
The best protection is a stop rule set before the pressure comes: a turn-round time, a limit on food or money. Turning back is not always right, though. Shackleton's own boat journey and mountain crossing of 1916 succeeded only because he pressed on through great danger. The test is whether the case for going on rests on fresh evidence about what lies ahead, or on what has already been spent and how close the goal looks.
The stop depth

Fiifi manages a well-drilling programme for a charity in northern Burkina Faso. At one village the rig had reached 80 metres and found no water. The budget left room for one more borehole that season, either deeper here or at a second site the survey had marked.
The drilling crew wanted to keep going: they had spent two weeks on this hole and felt sure water was close. Before drilling began, though, Fiifi and the surveyor had written down a stop depth of 90 metres, below which the rock in that area rarely gives water and costs rise steeply. At 90 metres, still dry, he called a halt. The crew grumbled as they packed up. At the second site they struck water at 55 metres, and the village had a working well before the dry season.
Try this today For one piece of work in progress, write down the sign that would tell you to stop. Decide it today, before you need it.
Cite or share this lesson
A plain reference you can paste into notes or an essay:
Quest2Plan. “The Courage to Turn Back.” https://quest2plan.com/learn/lesson/the-courage-to-turn-back. Accessed 29 November 2026.