Fog at the Start

In one line A vague goal lets each person picture a different result; concrete examples of done clear the fog early.

A goal can be clear to everyone in the room and still mean different things to each of them. 'A newsletter for the neighbourhood', 'a better website', 'a lively festival': each person hears the words, pictures their own version and nods. Because everyone agrees with the words, nobody discovers that they disagree about the thing.

The gap stays hidden while the work is abstract. It shows up when something concrete appears, usually late: the first draft, the finished room, the opening night. By then the time and money are spent, and the person who imagined something else feels let down or ignored. Fixing it at that point costs far more than it would have at the start, when a change was only a matter of saying so. Earlier in the course, Why Before What argued for naming the purpose before choosing what to make; fog is what happens when the purpose is named but never pictured.

The cheapest cure is to make the end concrete early. Instead of describing the goal in general words, the team gathers a few examples of what done would look like: a sample page, a photograph of a room someone likes, three things a visitor should be able to do. People argue about examples in a way they never argue about abstractions, and that is the point. Software teams call one version of this specification by example, and builders have long used drawings, models and sample boards for the same reason.

Examples do not settle every question, and they can narrow a team's thinking too soon, before a better idea has had a chance. Still, a goal that three people can describe in the same concrete terms is far safer than one they have merely agreed to.

Go deeper

Engineers who gather requirements have long noted the same trouble: people are often unsure what they need, leave out details they think obvious, and describe their wishes in words that can be read several ways. A common remedy is the rough prototype, a quick, cheap version that is meant to be thrown away. Its value lies less in the thing itself than in the arguments it starts, while changing course still costs little.

Three newsletters in one

Illustration: Three newsletters in one

Hana chairs a residents' association in Cebu City, in the Philippines, which agreed to start a monthly newsletter. Three months later the first issue appeared: four printed pages of neighbourhood news. The treasurer had expected an email setting out the association's accounts. The youth volunteer had imagined a page of photographs to share on phones. The oldest member had wanted a sheet for the notice board with the dates of meetings and rubbish collection.

Before the second issue, Hana tried something different. At the next meeting she laid four things on the table: the printed issue, a printout of a phone page, a typed notice and the accounts sheet. She asked each member to mark the one closest to what they had meant and to say who would read it. Within twenty minutes they had agreed on a single printed sheet for the notice board and the corner shop, with dates on the front and news on the back.

Try this today Take a goal you share with someone and ask them to describe, in plain detail, what it will look like on the day it is finished. Compare it with your picture.

Question 1 of 2

Ivan's charity in Bishkek, Kyrgyzstan, asks a designer for 'a modern logo'. After three rounds of drafts the board still rejects each one, though its members cannot agree on why.

What most likely went wrong at the start?

Question 2 of 2

Grace runs the office of a coffee cooperative in Mbale, Uganda. Her manager asks her for 'a better filing system' and leaves for a week.

Which first step would clear the fog most cheaply?

Cite or share this lesson

A plain reference you can paste into notes or an essay:

Quest2Plan. “Fog at the Start.” https://quest2plan.com/learn/lesson/fog-at-the-start. Accessed 29 November 2026.

Sources
  • Specification by example — Agreeing what a piece of work should do through realistic examples rather than abstract statements.
  • Requirements elicitation — Why asking people what they want is not enough, including ambiguous wishes and the use of prototypes.