Working Apart

In one line Distance takes away quick questions, shared context and easy trust, so distant teams must rebuild them on purpose.

Put a team in one corridor and much of its coordination happens without anyone planning it: a question asked across a desk, a frown in the lunch queue. In the 1970s Thomas Allen of the Massachusetts Institute of Technology measured how often engineers talked about their work. The frequency fell steeply as their desks moved apart, with a critical distance of about 50 metres for weekly technical talk.

By the late 1990s many expected networks and video to make such distances irrelevant. Gary and Judith Olson, psychologists at the University of Michigan, reviewed more than ten years of their field and laboratory studies and disagreed. In a paper of 2000 called Distance Matters, they wrote that distance was "in several essential respects immortal". Remote teams lost the quick question, the shared local context and the chance talk before and after meetings, and with them much of the ground trust grows on. When distant partners tried to work closely on hard problems, the Olsons saw the work slowly reorganized so that each site did a separate piece.

They named four conditions that decide how well a team copes. Common ground: what people already share, such as language, training and knowledge of one another. Coupling: how much back-and-forth the work needs; loosely coupled work, split into parts with clear edges, travels well, while tightly coupled work, like early design, does not. Readiness to collaborate: whether people want to share. Readiness with technology: whether people know the tools.

For a project lead, the point is not to pretend distance away but to make up for it on purpose. Build common ground with early visits, introductions and a shared list of terms; cut the work so that tightly coupled parts sit in one place; and open a channel where quick questions get quick answers. The clock, which no tool can change, is the next thing distance takes.

Two weeks in Hanoi

Illustration: Two weeks in Hanoi

Wuraola leads a small software team at an agricultural research institute in Ibadan, Nigeria. They build the programs that analyse soil samples for a study run with partner labs in Hanoi, Vietnam, and Montpellier, France. For the first three months the Hanoi programmers kept building features nobody had asked for. Their questions were saved up for a weekly call, and by then they had already guessed.

Wuraola spent two weeks in Hanoi working beside the team, and two of them later visited Ibadan. Together they wrote a glossary, because 'sample', 'plot' and 'site' meant different things in each lab. She split the work so that Hanoi owned the analysis module from end to end and Ibadan the data entry, with a written agreement on how the two would connect. She also opened a daily thread for quick questions, with a promise that each would be answered within one working day. By the next season the weekly call had shrunk to half an hour.

Try this today Count the quick questions you ask colleagues today. Then ask how a teammate in another city would get the same answers.

Question 1 of 2

Shamsul runs a bridge design office in Dhaka, Bangladesh, sharing one design with a partner office in Kuala Lumpur, Malaysia. The two offices must settle dozens of small details together each day, and every question waits for a weekly call.

In the Olsons' terms, what makes this arrangement so hard?

Question 2 of 2

A manager in Montevideo, Uruguay, tells her board: 'Our new video system is excellent, so our team in Lima can now work exactly as if they were down the corridor.'

What would the Olsons say is wrong with her claim?

Cite or share this lesson

A plain reference you can paste into notes or an essay:

Quest2Plan. “Working Apart.” https://quest2plan.com/learn/lesson/working-apart. Accessed 29 November 2026.

Sources
  • Distance Matters — Gary and Judith Olson's paper in Human-Computer Interaction, on common ground, coupling, readiness and what distance takes away.
  • Allen curve — Thomas Allen's finding that engineers talk far less often as the distance between their desks grows.
  • Judith S. Olson — A short life of one of the paper's authors and her research on teams working at a distance.