
Lesson · 6 min Steady
The Pyramid Maslow Never Drew
In one line Maslow described needs that overlap; the famous pyramid, with its strict floors, was drawn by someone else.
Almost every management course shows a pyramid: physiological needs at the base, then safety, love and belonging, esteem, and self-actualization at the tip. It is credited to Abraham Maslow, an American psychologist. But the pyramid is not in what Maslow wrote. His paper 'A Theory of Human Motivation', published in the journal Psychological Review in 1943, set out the five needs in words.
Maslow did say that some needs press harder than others: a starving person thinks of little but food. But he also wrote that the order was less rigid than it might sound. Most people, he suggested, have each need partly met and partly unmet at the same time. He gave figures, which he called arbitrary, of an ordinary person perhaps 85 per cent satisfied in physiological needs and 10 per cent in self-actualization. Some people even reverse the order.
The pyramid came later. The management historians Todd Bridgman, Stephen Cummings and John Ballard traced it to a 1960 article in the journal Business Horizons by Charles McDermid, a consulting psychologist, who offered the needs as stacked layers that a firm could use to motivate staff at low cost. The picture was simple and memorable, and it turned a loose ranking into a staircase where each floor had to be finished before the next.
Research supports part of the idea. Needs for food, safety, belonging, respect and growth appear across cultures; a study by Louis Tay and Ed Diener, using surveys from 123 countries, found each linked to well-being. What it does not support is a fixed order: people reported good relationships and a sense of growth even when their basic needs were not fully met. For a team lead, the better question is which needs are unmet now, not which floor someone is standing on.
Go deeper
In tracing the pyramid's history, Bridgman, Cummings and Ballard found an earlier step on the way. Keith Davis's widely used management textbook of 1957 showed the needs as steps inside a right-angled triangle, with an executive raising a flag at the top. That version did not catch on; the neat pyramid did. The authors suggest a ladder would be truer to Maslow: a climber has hands and feet on several rungs at once, and can move down as well as up.
The lab stays open

Lan teaches physics at a secondary school in Da Nang, Vietnam. After a typhoon flooded part of the city, a staff training session showed the pyramid and told teachers not to push pupils whose homes were damaged: until their basic needs were met, the trainer said, they could not care about learning.
Lan's best student was one of them. The girl came to school in borrowed shoes and asked to stay after class, because the classroom was dry and her experiments were the one part of the week that felt normal. Lan did both things at once. She told the school office, so the family could get help with food and repairs to the roof, and she kept the lab open late twice a week. The pyramid had offered a choice between the two; the girl needed them together.
Try this today Think of someone on your team. Name two needs of theirs that are pressing at the same time, and one small thing you could do about each.
Cite or share this lesson
A plain reference you can paste into notes or an essay:
Quest2Plan. “The Pyramid Maslow Never Drew.” https://quest2plan.com/learn/lesson/the-pyramid-maslow-never-drew. Accessed 29 November 2026.
Sources
- A Theory of Human Motivation (1943) — Maslow's original paper, reproduced in Classics in the History of Psychology.
- Who created Maslow's iconic pyramid? — Scientific American on the research tracing the pyramid to Charles McDermid.
- Researchers look for ingredients of happiness around the world — University of Illinois on the study of needs and well-being in 123 countries.