
Lesson · 6 min Steady
It Depends on the Person
In one line Situational leadership says to match how much you direct and support to each person's skill and confidence.
If no trait makes a leader, perhaps what matters is what a leader does. Studies at Ohio State University and elsewhere in the 1950s found that leader behaviour falls into two broad kinds: attention to the task, such as giving instructions and checking work, and attention to the relationship, such as listening and encouraging. The obvious next question was which mix works best.
In 1969 Paul Hersey and Ken Blanchard answered: it depends on the person being led. In their model, first called the life cycle theory of leadership and later situational leadership, a leader judges how ready someone is for a particular task, meaning how able and how willing or confident they are, and adjusts. A person who is new and unsure needs clear instruction, which they called telling. Someone keen but still learning needs instruction with explanation and encouragement, or selling. Someone able but hesitant needs support more than orders, or participating. Someone able and confident can be left to get on with it, or delegating. Readiness belongs to the task, not the person: an experienced nurse can be a beginner with a new machine.
The model spread quickly, because it is easy to teach and matches what good supervisors already sense: you do not guide a trainee in her first week and a colleague of twenty years in the same way. Blanchard later developed his own version, with styles called directing, coaching, supporting and delegating, and both versions are still widely taught.
Research has been less kind. Claude Graeff argued in 1983 that the model's logic was unclear, and tests by Robert Vecchio and colleagues gave weak support. A 1992 study of 91 nurses and their supervisors found results leaning the way the model predicts for less ready staff, but too small to rely on. The model may be most useful as a reminder to look at each person and each task, rather than as a proven rule.
Two nurses and a new pump

Salma is the charge nurse on a children's ward at a hospital in Rabat, Morocco. The ward is switching to new feeding pumps, and two nurses join her team in the same month to run them. One is fresh from training, eager, and has never used a pump of any kind. The other has fifteen years on wards and has used older pumps for most of them, but she is nervous of the new screens after an error at her last hospital.
Salma treats them differently. With the newcomer she walks through every step at the bedside and checks her first dozen set-ups herself, explaining why each matters. With the experienced nurse she gives almost no instruction, since the steps are familiar. Instead she asks what worries her, pairs her with the pump trainer for one morning, then leaves her the night shift's set-ups with a number to call. Within a month both run the pumps without help. Salma's style followed each nurse's readiness for this one task, not her rank or years.
Try this today Pick one task you hand out this week. Ask how able and how confident the person is with it, and adjust how closely you guide.
Cite or share this lesson
A plain reference you can paste into notes or an essay:
Quest2Plan. “It Depends on the Person.” https://quest2plan.com/learn/lesson/it-depends-on-the-person. Accessed 29 November 2026.
Sources
- Situational leadership theory — The life cycle model of 1969, its four styles and readiness levels, and Blanchard's later version.
- Paul Hersey — The behavioural scientist who conceived the model with Ken Blanchard.
- Situational Leadership Theory: A Replication (Norris and Vecchio) — The 1992 test with 91 nurses and their supervisors, and its weak results.