Lesson · 6 min Stretch

Who Decides?

In one line Many team quarrels are about whose call a choice is; naming who decides, who is asked and who is told heads them off.

Ask a team what it argues about and the answer is often not the decision itself but who got to make it. A design changes and the engineer is angry because nobody asked her. A manager picks a supplier and the finance office is hurt, because it thought the choice was its own. Each may be right about the facts and still feel overruled, because nobody ever said whose call it was.

It helps to separate three ways of taking part in a decision. Some people decide: the choice is theirs, and they answer for it. Some are consulted: they are asked before the choice is made and their view is weighed, but it is not a veto. Some are told: they hear what was decided, ideally soon and with the reasons. Trouble starts when the lines blur, and most of all when someone who was only consulted believes they had a vote.

In 1973 the psychologists Victor Vroom and Philip Yetton set out a range of ways a leader can decide, from deciding alone, through consulting people one by one or as a group, to letting the group decide together. No style, they argued, is right everywhere. It depends on how much the quality of the decision matters, who holds the facts, and whether it will work without people's willing acceptance. An office moving floors might let its director choose the building but let each team lay out its own corner.

The practical step is to write decision rights down for the main kinds of decision, not for every single one: changes to the budget, hiring, design, the timetable. Earlier in the course, Who Does What named the parts people play in a project; decision rights say what each part may settle. The rest of this week asks what happens when the one who decides is a whole group.

One page for a market

Illustration: One page for a market

Ghizlane leads the rebuilding of a covered food market for the town council of Meknes, Morocco. In the first two months three rows broke out. The traders' association was furious that the stall layout had changed without them. The architect felt the council's engineers were redesigning her roof. And the council's finance officer learned of a costly change to the drainage only when the bill arrived.

Ghizlane wrote one page listing six kinds of decision. Any change costing more than a set sum would be decided by the council's works committee, after consulting the architect and the traders. Stall allocation would be decided by the traders' association, with the council told. Daily site matters were the site engineer's to settle, and the finance officer would hear of any change touching money within a week. She took the page to each group and altered two lines after their comments. The next dispute, over the loading bay, took one meeting, because everyone knew whose call it was.

Try this today Pick one decision your team argued over lately. Write down who actually decided, who was asked first and who was only told.

Question 1 of 2

Haruna, a school inspector in Kano, Nigeria, is asked by the regional director for his view on a new exam timetable. He gives it, and the director chooses a different timetable.

What part did Haruna play in this decision?

Question 2 of 2

The lead of a new ferry terminal project in Mombasa, Kenya, drafts a list of decision rights. On design it says: 'decided jointly by the engineer, the port authority and the contractor'.

Which weakness in this line is most likely to cause trouble later?

Cite or share this lesson

A plain reference you can paste into notes or an essay:

Quest2Plan. “Who Decides?.” https://quest2plan.com/learn/lesson/who-decides. Accessed 29 November 2026.