Who Does, Who Decides, Who Is Asked
In one line A responsibility chart sets tasks against people and marks who does each, who answers for it, who is asked and who is told.
Decision rights can be put on one page. A responsibility chart, often called a RACI chart after its letters, lists tasks or decisions down the side and people or groups across the top. In each box goes a letter: R for responsible, the one who does the work; A for accountable, the one who answers for it and approves it; C for consulted, asked beforehand; I for informed, told afterwards. Variants change the letters. DACI names a driver who moves a decision along, an approver, contributors and those informed. RAPID separates who recommends, who must agree, who performs, who gives input and who decides.
Building one takes a few steps. List the tasks or decisions that cause confusion, leaving out the obvious ones. List the people and groups. Mark each box, and give each row a single accountable person: with two, each waits for the other, and with none, the row drifts. Then read the chart both ways. A row with no R is work nobody is doing; a column thick with letters belongs to someone who will be overloaded or hold everything up. Last, show it to everyone named and change it until they accept it, since people know their own jobs best.
It helps most where work crosses groups or organizations and people keep asking whether something is theirs: a building with a client, an architect, engineers and a contractor, or a software release that needs developers, testers, operations staff and the support desk. A small team that already knows who does what can do without one.
It goes wrong in familiar ways. Everyone is marked consulted on everything, so each decision needs ten conversations. Two people are both made accountable to spare feelings. Or the chart is filled in at the start, filed and never opened again. Earlier this week, Who Decides? separated deciding, being asked and being told; the chart writes that down.
The row nobody owned

Hafizah manages the building of a two-storey extension to a district clinic in Kuantan, Malaysia, for the state health department. After a month of crossed wires she drew a chart. Down the side went twelve rows, including approving design changes, choosing subcontractors, installing the piped medical gases and warning clinic staff before noisy work. Across the top went the health department, the architect, the main contractor, the clinic manager and herself.
Reading it showed three problems. The medical gas row had no R: the contractor thought the specialist would be hired by the health department, and the department thought the contractor had it in hand. The design row had two As, the architect and the department. And the clinic manager was marked C on every row, which explained why she spent her days in meetings. Hafizah took the draft to the next site meeting, where the contractor took on the gas work and the department took the design approval. The clinic manager kept a C on four rows and an I on the rest.
Try this today Take one task your team keeps arguing over. Write who does it, who answers for it, who must be asked and who must be told.
In the Toolkit, step by step: RACI and DACI charts →
Cite or share this lesson
A plain reference you can paste into notes or an essay:
Quest2Plan. “Who Does, Who Decides, Who Is Asked.” https://quest2plan.com/learn/lesson/who-does-who-decides-who-is-asked. Accessed 29 November 2026.
Sources
- Responsibility assignment matrix — The RACI letters, the one-accountable rule and variants such as DACI.
- RACI process — The University of Leeds' practical guide to drawing and agreeing a RACI chart.