Lesson · 6 min Steady
Studying Only the Winners
In one line Lessons drawn from successes alone miss the failures that did the same things and vanished.
During the Second World War the statistician Abraham Wald worked in the Statistical Research Group at Columbia University in New York, which applied mathematics to military problems. In memoranda written in 1943 he worked out how to estimate where bombers were most vulnerable from the damage on the planes that came back. The insight at the heart of the work is simple. The returning planes show where an aircraft can be hit and still get home; the hits that brought planes down are on the ones that never returned. The story is often retold with vivid details that are less well documented, but the point stands without them.
The error has a name, survivorship bias: drawing lessons from a sample that has already been filtered by the outcome. Business books are full of it. In 1982 Tom Peters and Robert Waterman published In Search of Excellence, which studied 43 successful American companies and found eight shared traits, such as a bias for action and staying close to the customer. Two years later the magazine Business Week reported that about a third of those companies had run into trouble.
The deeper problem is one the business professor Phil Rosenzweig called connecting the winning dots. If you look only at winners, you cannot tell whether the losers had the same traits. Perhaps many firms that also acted quickly and stayed close to customers went bust, and nobody wrote about them.
The remedy is to ask what the missing cases would show. Before copying a practice, look for teams that used it and failed, and teams that succeeded without it. Success stories still have value as ideas to test. Earlier in the course, What a Failed Project Teaches made the case for studying failure; Wald shows why failure is part of the evidence.
Go deeper
Wald was born in 1902 in Kolozsvár, then in Hungary and now Cluj-Napoca in Romania, and moved to the United States in 1938. In 1950 he and his wife were killed when their plane crashed in the Nilgiri hills of southern India during a lecture tour. His wartime work on sequential analysis, a way of deciding when enough evidence has been gathered to stop testing, is still used in quality control and in medical trials.
What our best projects did

Gebre works in the planning office of a regional roads authority in Bishoftu, Ethiopia. His director asks him to write a guide called 'What our best projects did', drawing on the five road projects that finished on time and on budget. All five held a weekly site meeting with the contractor and kept a shared photo log.
Before writing, Gebre pulls the files of every project from the past ten years, including the three that were cancelled and the six that ran badly late. Most of those also held weekly site meetings, and two kept photo logs. What the five successes had and the others lacked was something nobody had listed: the land for the road was cleared of disputes before any contract was signed. His guide leads with that, and notes that the meetings were common to winners and losers alike.
Try this today Think of a practice you admire in a successful team. Try to name one team that did the same thing and still failed.
Cite or share this lesson
A plain reference you can paste into notes or an essay:
Quest2Plan. “Studying Only the Winners.” https://quest2plan.com/learn/lesson/studying-only-the-winners. Accessed 30 November 2026.
Sources
- Survivorship bias (Wikipedia) — The error explained, with Wald's 1943 memoranda for the Statistical Research Group.
- Abraham Wald (Wikipedia) — Wald's life, his wartime work at Columbia and his method for estimating damage to aircraft.
- In Search of Excellence (Wikipedia) — The 1982 book's 43 companies, its eight traits, and later criticism of its method.