Holes in the Cheese
In one line Harm gets through when the weak spots in several defences happen to line up at the same moment.
Between a hazard and harm there are usually several defences: a design, a procedure, a second person's check, an alarm, a last warning. The psychologist James Reason, of the University of Manchester, pictured them as slices of Swiss cheese standing in a row. Every slice has holes, and the holes shift and change size. Usually a hole in one slice is covered by solid cheese in the next. An accident happens when, for a moment, the holes in every slice line up.
In Human Error (1990) Reason distinguished two kinds of hole. Active failures are the slips and mistakes of people at the sharp end, such as the nurse who picks up the wrong ampoule or the signaller who sets the wrong route; their effects are felt at once. Latent conditions, as he later called them, are built in earlier, often by people far from the scene: two drugs in look-alike packaging stored side by side, a rota that leaves one tired person doing two jobs. They can lie unnoticed for years until an active failure finds them.
The picture changes what a review looks for. Stopping at the person at the sharp end closes one hole in one slice. A team can trace further back with five whys: state the problem exactly, ask why it happened and answer with a fact that can be checked, then ask why again until a cause appears that the team can change. Five is a rough guide, not a rule. When an answer has two parts, follow both, since there is rarely a single hole. Read the chain backwards, saying 'and therefore' between links, then fix the causes and watch whether the problem returns.
Earlier in the course, Everyone Owns Quality showed the fishbone diagram, which spreads the search wider still. Both tools serve the same aim: to look past the last person who touched the work.
Go deeper
Both tools have critics. Some safety researchers say the cheese picture is too tidy: real defences are not separate slices, and in complex systems causes interact rather than simply line up. Five whys draws sharper criticism. A former head of global purchasing at Toyota, where the method grew up, called it too basic for deep problems, and writers in patient safety have argued that it follows one chain to one root cause when most failures have many. Different teams asking why about the same event often reach different answers.
Ten times the dose

Faraja is the nurse in charge of a medical ward at a hospital in Mwanza, Tanzania. One night a patient with diabetes was given ten times his insulin dose. A colleague noticed his confusion within the hour, he was given sugar, and he recovered. The nurse who gave the dose was distraught and expected to lose her job.
Faraja led the review with five whys and refused to stop at the nurse. Why the wrong dose? The handwritten chart said '4U', and the U looked like a zero. Why handwritten? The ward's printed charts had run out a month before. Why was it not caught? The second-nurse check before insulin was skipped, because the only other nurse was with a dying patient. Why only two nurses? The night rota had been cut. Four holes had lined up. The ward stopped abbreviating 'units', reordered charts with a reserve stock, and asked for a third night nurse.
Try this today List the defences between one mistake in your work and real harm. For each, ask what hole in it you already know about.
Cite or share this lesson
A plain reference you can paste into notes or an essay:
Quest2Plan. “Holes in the Cheese.” https://quest2plan.com/learn/lesson/holes-in-the-cheese. Accessed 30 November 2026.
Sources
- Swiss cheese model — James Reason's model of layered defences, active failures and latent conditions, and its critics.
- James Reason — A short life of the Manchester psychologist and his books on human error and organizational accidents.
- Five whys — The questioning method that grew up at Toyota, and the main criticisms made of it.