Quest2PlanChart the course. Lead the crew.

Lesson · 6 min Steady

The Human Computers

In one line Before electronic machines, teams of people did the sums, and their careful checking was what others trusted with their lives.

Before electronic machines, a computer was a person. At the Langley laboratory in Virginia, run by NASA's forerunner, the National Advisory Committee for Aeronautics, women worked through the calculations behind wind tunnel tests and flight research with desk calculators and paper. Langley had five women computers in 1935 and about 400 by 1946, as the Second World War brought new demand.

Virginia's segregation laws reached inside the laboratory. From 1943 Black women mathematicians worked in a separate West Area Computing section, with separate dining rooms and toilets. Dorothy Vaughan led the section from 1949 and became the agency's first Black woman manager. The segregated office was abolished in 1958, when the committee became NASA.

Katherine Johnson joined in June 1953 and was soon assigned to flight research, working with engineers on the paths of aircraft and later of spacecraft. She calculated the trajectory for Alan Shepard's flight in 1961. For John Glenn's orbital flight on 20 February 1962, electronic computers worked out the orbit, but the astronauts were wary of the new machines. Glenn asked for Johnson to check the computer's numbers by hand, and said that if she approved them, he was ready to go.

The story shows two things a project depends on. One is checking: a second calculation, made independently by someone whose care is known, is what made a new machine trustworthy. The other is credit. The computers' work ran through the laboratory's reports, but their names rarely appeared on them; Johnson recalled that a 1960 report she wrote with an engineer was the first time a woman in her division had her name on one. Whose work a project records shapes what it can learn later.

Two teachers and a shifted key

Illustration: Two teachers and a shifted key

Pemphero runs the marking of a regional school examination for an education office in Mzuzu, Malawi. The answer sheets are read by a scanning machine, which marks forty thousand papers in two days. The machine had never been wrong, everyone told her, and the results were due at the ministry on Friday.

Pemphero asked two experienced teachers to mark a random hundred papers by hand and compare them with the machine. On one version of the science paper their marks were lower than the machine's for almost every pupil. The answer key for that version had been loaded one question out of step. The office fixed it, re-ran the marks and sent the results a day late. In the report, Pemphero named the two teachers and described their check, so the next year's office would know who had done it and why it mattered.

Try this today Find one piece of work your team relies on that nobody checks independently. Ask who could check it another way.

Question 1 of 2

A new computer model at a bridge design office in Cochabamba, Bolivia, gives the loads for a footbridge over a busy road. The chief engineer, Ricardo, must decide whether to trust it.

What would follow the example of Glenn's flight?

Question 2 of 2

A household survey in Irbid, Jordan, relies on six data clerks who catch most of the errors in the forms. The final report lists only the two lead researchers.

What does the human computers' story suggest is lost here?

Cite or share this lesson

A plain reference you can paste into notes or an essay:

Quest2Plan. “The Human Computers.” https://quest2plan.com/learn/lesson/the-human-computers. Accessed 29 November 2026.

Sources
  • Katherine Johnson Biography — NASA's biography of Johnson, by Margot Lee Shetterly, including her check of the orbit for Glenn's flight.
  • West Area Computers — The segregated section of Black women mathematicians at Langley from 1943 to 1958, led by Dorothy Vaughan.
  • Mercury-Atlas 6 — John Glenn's three-orbit flight in Friendship 7 on 20 February 1962.