Acceptance sign-off

The recorded moment when the customer agrees the work is complete against the criteria agreed at the start.

Who takes part

Customer Project lead Sponsor Testers or inspectors

How to do it

  1. Bring back the criteria

    Take out the acceptance criteria agreed at the start, and any changes approved since. Sign-off is checked against these, not against what anyone now wishes.

  2. Agree how to check

    Agree with the customer who will check each criterion and how: an inspection, a test, a trial run, a count.

  3. Check together

    Go through the checks with the customer present, and record each result as met or not met, with evidence.

  4. List what is left

    Write down every small fault or unfinished item, with who will fix it and by when. Small items need not hold up sign-off if both sides agree.

  5. Sign and date

    The customer signs a short statement that the work is accepted, with the list of remaining items attached. Keep a copy each.

  6. If they will not sign

    Ask which criterion is not met. If it is met, show the evidence; if a new wish has appeared, treat it as a change, not a fault.

Where it goes wrong

  • No criteria were agreed at the start, so sign-off becomes an argument about what was meant.
  • The customer is asked to sign in a hurry at the end of a long day and later disputes it.
  • New wishes are added at the final check and treated as faults the team must fix for free.

When to skip it

For informal work between friends, a family or one small team, a written sign-off can feel like distrust. Saying aloud "this is done, are you happy?" may be enough.

The one-page template

The headings to put on one sheet. Print it with room to write, or copy them into whatever your team already uses.

  1. Work being accepted
  2. Criteria agreed at the start (and approved changes)
  3. How each was checked, by whom
  4. Result: met or not met, evidence
  5. Items still to finish, owner, date
  6. Statement of acceptance
  7. Customer's name, signature, date

Print this template Every template, one to a page

Cite or share this page

A plain reference you can paste into notes or an essay:

Quest2Plan. “Acceptance sign-off.” https://quest2plan.com/learn/ideas/toolkit/acceptance. Accessed 29 November 2026.