Handover plan

A plan for passing a project's result to the people who will run it every day, with the training, papers and support they need.

Who takes part

Project team Receiving team Sponsor Users

How to do it

  1. Name who receives it

    Early in the project, name the people or team who will own the result afterwards, and bring them into the work well before the end.

  2. List what passes over

    List everything they will need: manuals, drawings, keys and access codes, spare parts, contracts, warranties and contacts.

  3. Train the people

    Train those who will run it, on the real thing where possible, and check they can do the everyday tasks without the project team watching.

  4. Run side by side

    Agree a period when both teams work together, or when the old way still runs alongside, so problems surface while help is near.

  5. Agree the support period

    Say how long the project team will answer calls and fix faults after handover, and who pays. Then say clearly when that support ends.

  6. Hand over formally

    Meet, go through the list, note anything outstanding with a date to finish it, and record that responsibility has passed.

Where it goes wrong

  • Handover is planned in the last week, so the receiving team meets the result for the first time on the day they own it.
  • Documents describe how the thing was built, not how to run it, clean it or fix it.
  • The project team disbands the day after handover and nobody knows who to call.

When to skip it

When the team that builds a thing will also run it, a formal handover adds little. A short list of open faults and where the papers are kept is enough.

The one-page template

The headings to put on one sheet. Print it with room to write, or copy them into whatever your team already uses.

  1. What is being handed over
  2. Who receives it (team, named person)
  3. Documents and records passed over
  4. Equipment, spares and keys passed over
  5. Training given, to whom, checked by
  6. Support period: who, how long, how to call
  7. Items still open, owner, date
  8. Date responsibility passes

Print this template Every template, one to a page

Cite or share this page

A plain reference you can paste into notes or an essay:

Quest2Plan. “Handover plan.” https://quest2plan.com/learn/ideas/toolkit/handover. Accessed 29 November 2026.