Kanban board

A board of columns where each piece of work is a card that moves from waiting to done, so the whole team can see the flow.

Who takes part

Team Project lead People who ask for work

How to do it

  1. Map how work really flows

    Write the stages a piece of work actually passes through, such as waiting, doing, checking, done. Draw the real path, not the one in the procedure manual.

  2. Put every piece on a card

    One card per piece of work, on a wall, a whiteboard or a shared board. Hidden work, favours and urgent extras go up too, or the board lies.

  3. Limit work in progress

    Agree how many cards may sit in each busy column at once. When a column is full, people help finish something before starting anything new.

  4. Pull, don't push

    A person takes the next card when they have room, rather than having work handed to them. The top of the waiting column holds the most important card.

  5. Look at it together

    Stand at the board regularly and read it from right to left: what is nearly done, what is stuck, where cards pile up.

  6. Change the board as you learn

    Add a column, change a limit, mark blocked cards in red. The board is the team's tool and should change as the work does.

Where it goes wrong

  • There are no limits, so the 'doing' column holds forty cards and nothing finishes.
  • Half the real work never goes on the board, so it looks calm while people are swamped.
  • Cards sit in 'done' that are not done, because nobody agreed what done means.

When to skip it

For a one-off job with a fixed order of steps, such as pouring a slab, a simple checklist or dated plan is clearer than a board. A board earns its keep when many small pieces of work arrive and flow.

The one-page template

The headings to put on one sheet. Print it with room to write, or copy them into whatever your team already uses.

  1. Waiting (most important at the top)
  2. Doing (limit: __)
  3. Checking (limit: __)
  4. Done
  5. Blocked, and why
  6. What the team agreed about limits
  7. Date the board was last tidied

Print this template Every template, one to a page

Cite or share this page

A plain reference you can paste into notes or an essay:

Quest2Plan. “Kanban board.” https://quest2plan.com/learn/ideas/toolkit/kanban-board. Accessed 29 November 2026.