Programme

Overview

A set of related projects run together because together they deliver one outcome none could deliver alone.

A programme groups projects that depend on each other: a rocket, its launch site and its tracking network, or new schools, new teachers and a new curriculum. A programme manager looks after the links between them and the benefit they are meant to bring, while each project keeps its own manager. The Apollo programme (1961 to 1972) is the classic example.

Where it is used

The Apollo programme, 1961 to 1972
Rockets, spacecraft, launch sites and tracking stations were built as linked projects for one goal.
A national vaccination drive
Supply, cold storage, training and public information run as projects under one programme.
A city's flood defences
Walls, pumps, warning systems and drainage are separate projects managed for one result.
A post-war housing programme
Land, materials, builders and new towns are planned together to house a country.

The case for and against

The case for

  • Links between projects are managed by someone, instead of falling between them.
  • The programme keeps sight of the outcome, not just each project's deliverables.
  • Scarce people and money can be moved between projects as the picture changes.

The case against

  • Another layer of management adds cost and can slow decisions.
  • Benefits are hard to measure and arrive late, so they are easy to claim and hard to check.
  • A programme can grow far beyond its first aim and become hard to stop.

Both columns give the strongest honest case. Which weighs more depends on the place, the time and what the people there want from their work.

Practices that argued for or about it