Three-point estimate
An estimate made from three numbers, the best case, the most likely and the worst case, which gives a range and a sense of risk instead of one hopeful figure.
Who takes part
People who will do the work Project lead Specialists
How to do it
- Choose a piece small enough
Estimate pieces from the work breakdown, not the whole project at once. Small pieces are easier to picture honestly.
- Ask for the best case
How long if things go well, though not miraculously? The kind of good run that happens perhaps one time in ten.
- Ask for the most likely
How long does this kind of work usually take, judging from the last few times it was done?
- Ask for the worst case
How long if the usual troubles strike: the delivery is late, the ground is rock, the expert is ill? Not the end of the world, but a bad run.
- Combine them
A common way is best plus four times likely plus worst, divided by six. The gap between best and worst shows how uncertain the piece is.
- Report a range
Give the sponsor a range with a likely point, such as four to seven weeks, likely five, and say what drives the spread.
Where it goes wrong
- The worst case is written as the likely case plus ten per cent, so the range looks narrow and safe.
- Only the middle number is passed on and the range is forgotten by the next meeting.
- The estimate is made by someone who will not do the work.
When to skip it
For routine tasks done many times with steady results, the average from past records is quicker and at least as good.
The one-page template
The headings to put on one sheet. Print it with room to write, or copy them into whatever your team already uses.
- Piece of work
- Who estimated it
- Best case
- Most likely
- Worst case
- Combined estimate
- What drives the spread
- Actual (filled in afterwards)