The mum effect
Also called: Keeping mum
People hold back bad news from those who need it, so problems travel slowly upwards.
What it is
Sidney Rosen and Abraham Tesser named the mum effect in 1970: people are reluctant to pass on bad news, even when it is not their fault and they gain nothing by keeping quiet. In their experiment, people who overheard that another participant should call home about urgent news passed the message on far more readily when the news was good than when it was bad. Researchers have since argued about why: fear of being blamed, not wanting to upset the hearer, or wanting to seem kind. In a project the result is the same: the people who most need to hear about a problem hear last.
An example
A crew is building the stage for an outdoor concert in Cape Town. On the Tuesday before the show, a rigger notices that a supplier has sent the wrong steel for the roof. He tells his supervisor, who hopes it can be swapped and says nothing to the production manager until Thursday. By then the right steel cannot arrive in time, and the roof has to be redesigned overnight. Asked later, both men said they had not wanted to cause a fuss before they had a solution.
How to spot it
Problems that reach you days after the people doing the work knew. News that arrives already softened, or only once a fix is ready. Silence in meetings after something has gone wrong. People who wait to raise a problem until they have solved it.
The way out
Make bad news cheap and quick to deliver. Ask specific questions ('what worries you most this week?'), thank whoever brings a problem before discussing it, agree that a problem is raised within a day even without a solution, and never punish the messenger.
When it is wise
Taking an hour to check a worry before raising an alarm, or choosing a private moment to deliver hard personal news, is wise when a short delay changes nothing and avoids needless panic.
Printable sheet of every technique
Cite or share this page
A plain reference you can paste into notes or an essay:
Quest2Plan. “The mum effect.” https://quest2plan.com/learn/ideas/traps/mum-effect. Accessed 29 November 2026.