Traps · Reading the numbers
Local optimization
Also called: Sub-optimization
Each part of a project improves its own numbers while the whole thing gets slower or worse.
What it is
A project is a chain of work passing between people and teams. When each part is judged on its own figures, each does what makes those figures look good: buyers buy cheaply, builders keep their crews busy, testers test in large batches. Each choice is sensible locally, and together they can slow the whole flow. Eliyahu Goldratt's 1984 novel The Goal argued that a system's output is set by its constraint, its slowest step, so improving any other step changes nothing for the whole and may only pile more work in front of the bottleneck.
An example
A fruit farm pays its pickers by the crate and its packing shed by the hour. The pickers are fast, so crates pile up in the sun outside a shed that can pack only so many a day, and some fruit spoils before it is packed. The farm's best picking week is also its worst week for waste. When the manager moves two pickers into the shed and slows picking to match packing, fewer crates are picked and more fruit reaches the market.
How to spot it
Teams that each report good numbers while the project as a whole is late. Piles of finished work waiting in front of one step. Arguments about whose numbers matter. Improvements that make one group's life easier and another's harder.
The way out
Judge each part by what it does for the whole. Find the step that limits the flow, protect and help it, pace the other steps to it, and share one measure of results across the teams instead of a separate score for each.
When it is wise
Improving one part on its own is right when that part is the bottleneck, or when it is a separate piece of work with its own customers. Teams also need some local measures to run their own work day to day.
Printable sheet of every technique
Cite or share this page
A plain reference you can paste into notes or an essay:
Quest2Plan. “Local optimization.” https://quest2plan.com/learn/ideas/traps/local-optimization. Accessed 29 November 2026.